UNLEASH THE POWER OF AI IN YOUR YARD
Nitro Suite

NitroYard

How many challenges originate in the yard?

Yards face numerous challenges on a daily basis, such as the non-accurate ETA of trains. Yards are also tasked with ensuring the delivery of the right train at the right time, which is essential to maintain the flow of operations for both the crew and the main line. This on-time and accurate delivery is key to achieving Service Level Agreements (SLAs) and the best rail results.

Yard Challenges

OVERVIEW

NitroYard is designed to plan and optimize yard movements – including train arrivals, scout locomotives, loading and unloading, and train formation – and can be integrated with other railroad systems.

Benefits include a reduction of 10% in dwell time, better accuracy and integration with the mainline, energy efficiency, and added value to customers. Additionally, when NitroYard is coupled with the Nitro Movement Planner (NitroMP), railroads can achieve up to a 14% average velocity increase and up to a 30% reduction in meeting and pass time.

BENEFITS

NitroYard Automation Journey

Nitro Suite Benefits Savings

AUTOMATION IS A JOURNEY

NitroYard, as the brain of the intelligent yard, and together with other technologies such as other Nitro Suite solutions, Talos, PowerView and Uptime allow rail customers to take a building block approach to autonomy, adding on solution, one process, or one technology at a time and at a rate that makes sense for your operation.

NitroYard Automation Journey

APPLICATION EXAMPLE

Port of Santos Yard

65 Mton/year of grains and sugar (~32% of Brazil exports)

Complexities:

NitroMP Nitro Rumo Customer Testimonial

https://www.youtube.com/watch?v=iTQ59Pm19bs

SALES CONTACTS

João Paulo Duarte, Commercial Director

EMAIL

Rodrigo Gonçalves, Technical Director

EMAIL

https://main--progressrail--aemsites.aem.page/widgets/card-list/card-list.html?root=/segments/rail-technology